INICIO > Casos Prácticos > AT&T — Actualización del prototipo COB
Casos de éxito July 2026 · 14-Day Sprint

4-in-1 COB Prototype for AT&T Retail Pillars

Following AT&T's successful 630-unit P2.5 pillar rollout, the next question was inevitable: which pixel pitch for flagship stores? Rather than months of theoretical debate, DOIT VISION engineered a 4-in-1 prototype pillar with P1.25, P1.538, P1.86 COB, and the original P2.5 SMD all on a single unified chassis. Delivered in 14 days, AT&T decision-makers walked around the pillar comparing resolutions side by side. More importantly, 100% backward compatibility means these new COB modules are millimeter-level drop-in replacements for the existing 320x160mm chassis, future-proofing 630 deployed pillars.

Prototipo de pilar LED COB multipaso 4 en 1 que muestra COB P1.25, P1.538, P1.86 y SMD P2.5 en un solo chasis con contenido sincronizado.
Lanzamientos
4-en-1
P1.25 to P2.5 on one chassis
Cronograma
14 Días
Entrega de prototipos
Compatibilidad
100%
Compatible con versiones anteriores
Footprint
320x160
Reemplazo de módulo directo
Impartido por Equipo de ingeniería de DOIT VISION · · Revisado por Kris LiangCofundador · Agosto de 2026
CE · EMC · RoHS
15 ingenieros · Equipo de 60 personas en Shenzhen
Más de 55 países · NovaStar · Colorlight
PCB de contorno + flexibleMooncell + ResolumeEnsamblaje Poka-Yoke
Resumen del proyecto

A simple vista

Cliente
AT & T
Flagship store upgrade path
Concepto
4-in-1 Prototype
Walk-around pitch comparison
Pitches Tested
P1.25/P1.538/P1.86/P2.5
3 COB + 1 SMD baseline
Método de actualización
Reemplazo directo
Zero chassis modification
Función clave
Synchronized Content
All 4 faces running same video
El desafío más difícil
Mixed-Pitch Corners
Different PCB thicknesses & masks
Para el Futuro
320×160 Universal
Protects 630-pillar investment
Método de retroalimentación
Side-by-Side Visual
Decide in minutes, not months
01 — El resumen

Which Pitch for Flagship?

After deploying 630 P2.5 SMD pillars across Costco locations, AT&T's next logical question was whether flagship stores warranted a higher-resolution upgrade. But debating pixel pitches over spec sheets and renderings would take months with no resolution — everyone has an opinion on paper, but seeing is deciding.

DOIT VISION proposed a radical shortcut: build a single prototype pillar with all four candidate pitches mounted side by side, running the same synchronized content. Decision-makers could physically walk around the pillar, compare resolutions at actual viewing distances, and decide in minutes instead of months of meetings.

Prototipo de pilar LED COB multipaso 4 en 1 que muestra COB P1.25, P1.538, P1.86 y SMD P2.5 en un solo chasis con contenido sincronizado.
02 — Backward Compatibility

Millimeter-Level Drop-In Replacement

The engineering mandate was non-negotiable: every new COB module must be a literal drop-in replacement for the existing 320x160mm SMD modules across all 630 deployed pillars.

Magnetic cylinder positions, CNC alignment pin holes, hub board interfaces, and power routing — every physical interface dimension was matched down to the millimeter. The 320x160mm universal footprint guarantees that as LED technology advances, AT&T's structural investment in the pillar chassis and Costco store infrastructure remains fully protected.

Mixed-Pitch Corner Engineering

The biggest challenge: P1.25 COB and P2.5 SMD have completely different PCB thicknesses, mask designs, and resin encapsulations. At the 90-degree corner where two different-pitch modules meet, distinct CNC milling profiles were required for each module type to achieve a visually seamless join — a tolerance challenge standard single-pitch pillars never face. Each module's aluminum frame edge was individually profiled to compensate for its specific thickness and mask geometry.

En cifras

Especificaciones del proyecto

14
Entrega del día
Concept to physical prototype
4
Pixel Pitches Compared
P1.25 · P1.538 · P1.86 · P2.5
320 × 160
Universal Footprint
100% backward compatible across gen
630
Existing Pillars
All upgradeable via drop-in module swap
3
COB Variants Tested
+ 1 SMD baseline for reference
0
Modificaciones del chasis
True drop-in — no tools or drilling
Cómo entregamos

From Pitch Debate to Physical Prototype

Fase 01

Lock the Question

AT&T needed a side-by-side pitch decision for flagship stores — not another PDF comparison. We defined four pitches on one chassis: P1.25 / P1.538 / P1.86 COB plus the original P2.5 SMD.

Fase 02

Unified Chassis Design

Kept the 320×160mm magnetic footprint identical across all four pitches. CNC-profiled mixed-pitch 90° corners so each module type seats flush without chassis redesign.

Fase 03

14-Day Build

Fabricated the 4-in-1 pillar, loaded synchronized content, and burn-in tested so decision-makers could walk around live pixels — not CAD renders.

Fase 04

Drop-In Upgrade Path

Proved COB modules install into the existing 630-unit fleet chassis with zero tooling change — literal drop-in when flagship stores select a finer pitch.

Planning a product upgrade path?

Multi-pitch prototypes eliminate months of debate. See all your resolution options on one chassis, running synchronized content. Prototype delivery in 2 weeks.

Habla con un ingeniero →
Preguntas del comprador

Preguntas frecuentes

Can I compare different LED pitches on a single prototype?
Yes. This AT&T prototype mounted four pixel pitches on one unified chassis running synchronized content. Decision-makers walk around and visually compare resolutions at actual viewing distances, eliminating months of theoretical debate about which pitch to choose.
How does backward compatibility work for LED module upgrades?
By designing COB modules to the exact same 320×160mm footprint with identical magnetic positions, alignment pin holes, and connector interfaces as the legacy SMD modules, new modules become literal drop-in replacements. No chassis modification, no new tooling, no re-wiring. Swap a module in under 30 seconds.
How fast can you deliver a multi-pitch comparison prototype?
The AT&T 4-in-1 prototype was delivered in 14 days from concept to physical unit. Standard pitches (P1.5–P2.5) typically ship in 10–14 days. Sub-P1.0 pitches may require additional module lead time due to supply chain constraints on ultra-fine-pitch components.
What happens when different pitch modules meet at a 90-degree corner?
Different pitches have different PCB thicknesses, mask profiles, and encapsulation depths. Each module type at the corner requires a distinct CNC milling profile on the aluminum frame to maintain a visually seamless join. This mixed-pitch corner engineering is significantly more complex than standard single-pitch corners and requires per-module-type profiling.
Can existing P2.5 pillars be upgraded without replacing the chassis?
Yes — that was the design constraint. COB modules share the same 320×160mm magnetic footprint and connector interface as the original P2.5 SMD modules. Flagship stores can upgrade face-by-face without scrapping the 630-unit chassis investment.
Do COB modules need a different controller than the original SMD pillars?
No. The prototype and upgrade path keep NovaStar TB40 + BrightSign control identical to the mass-production pillars. Content playlists and brightness schedules transfer without a new media-player stack.
Which pitches were compared on the AT&T 4-in-1 prototype?
Four pitches on one chassis: P1.25 COB, P1.538 COB, P1.86 COB, and the original P2.5 SMD. Synchronized content lets buyers judge clarity, seam behavior, and viewing-distance comfort in one walk-around.
What is the typical MOQ for a multi-pitch prototype program?
Prototype programs start at a single unit — this AT&T pillar was one chassis built for decision-making. Production upgrades then follow the existing fleet schedule; there is no separate prototype MOQ once the pitch is selected.

Tu forma personalizada, diseñada con precisión.

Envíenos los planos o un boceto aproximado del diámetro y la altura; evaluaremos si una solución flexible por sí sola es viable. Le responderemos en un plazo de 24 horas.

Contacta con un ingeniero por WhatsApp Solicitar cotización Ver todos los casos prácticos
Fabricante
VISIÓN DOIT
Autor
Kris Liang, cofundador e ingeniero jefe
Experiencia del autor
19 años de experiencia en ingeniería de pantallas LED.
LinkedIn del autor
https://www.linkedin.com/in/krisliang-doitvision/
Tipo de contenido
Casos de éxito
Tema principal
4-in-1 Multi-Pitch COB Prototype — AT&T Retail Pillar Upgrade Path
Tecnologías clave
COB LED, Multi-Pitch Comparison, 320×160mm Drop-In Module, Mixed-Pitch 90° Corner, Backward Compatibility, NovaStar TB40, BrightSign
Cliente
AT & T
Pitches Compared
P1.25 / P1.538 / P1.86 COB + P2.5 SMD
Cronograma
14-day prototype delivery
Fecha de publicación
2026 de julio
Fecha de revisión
Agosto del 2026
Certificaciones
CE, EMC, RoHS, CB, TÜV
Países donde estamos presentes
55+
Fundado
2013, Shenzhen, China
Ingenieros internos
15
Tráenos el resumen

Comienza tu proyecto.

Un dibujo, una foto del lugar o una idea inicial. Cuéntanos qué tienes planeado y trabajaremos en los detalles con nuestro equipo de ingeniería.

Utilizamos estos datos para responder a su proyecto. Aviso de privacidad.