How Much Do Outdoor LED Billboards Cost by Size?
DOIT VISION’s 2024 guide estimated US$5,000–15,000 for a 20 m² P10 billboard screen and US$15,000–50,000 for a 50 m² P5 screen. These are historical screen estimates. For a current installed price, start with a dated equipment quote and add freight, the supporting steelwork, site power and installation at the proposed location.
2024 billboard prices by screen size
The original guide was published in January 2024 and updated that May. The sizes below are nominal dimensions for one display face. Multiply width by height before converting units. One square foot equals exactly 0.09290304 square meters.
| Nominal face and pitch | 2024 estimate (USD) | Area per face | Correct size band |
|---|---|---|---|
| 4 × 5 m · P10 | 5,000-15,000 dólares estadounidenses | 20 m² · 215 ft² | 100–300 pies cuadrados |
| 10 × 5 m · P5 | 15,000-50,000 dólares estadounidenses | 50 m² · 538 ft² | Más de 300 pies cuadrados |
| 14 × 9 m · P10 | US$50,000 to several hundred thousand | 126 m² · 1,356 ft² | Más de 300 pies cuadrados |
Suppose you have a US$25,000 project ceiling for one 20 m² face. Using the upper end of the historical P10 screen estimate (US$15,000) leaves US$10,000 for all other costs. Compare that remainder with local quotes for controls and packing, freight, support steel, electrical work and installation. The remainder is the money available for those items, not an estimate of what the contractors will charge.
The three bands are under 100 ft² (under about 9.29 m²), 100–300 ft² (about 9.29–27.87 m²), and over 300 ft² (over about 27.87 m²). The smallest example in the old guide was already 215 ft². For a sign below 100 ft², use its actual dimensions to request a quote. The table rounds face areas to the nearest square foot.
The 20 m² and 50 m² estimates included receiving cards and cables. The guide excluded the controller and packaging and gave no freight amount. For the 126 m² example, it gave a broad range without itemizing the supply package. None of the three examples establishes a delivered or installed total.
Screen equipment cost
Give the supplier the target width, height, number of faces and closest viewing position. Ask for a cabinet layout that shows the actual illuminated dimensions and the pixel pitch. A nominal 4 × 5 m opening may need an adjusted active area when built from whole cabinets.
Build the equipment subtotal from cabinet count × the quoted cabinet price, or active area × the quoted equipment rate per square meter. Then add any separately priced controller, cabling, spare modules and mounting accessories. Ask for a packing line if crates are outside the equipment price. A double-sided board needs two display faces, but its foundations and site setup can be shared.
- Suministros para pantallas
- Cabinet specification, quantities and included equipment.
- Preparación del sitio
- Steelwork, site power and data connections.
- Entrega y puesta en servicio
- Freight, lifting, installation and acceptance tests.
Single-face and double-sided billboard budgets
Two 4 × 5 m faces give a back-to-back sign 40 m² of nominal screen area, with 20 m² visible from each approach. Ask for two cabinet schedules and identify whether both faces carry the same programme or separate campaigns. The support, power feed and installation crew may serve both faces. Have each contractor price that shared work once and identify any extra lifting or access needed for the second face.
Freight and delivery cost
Give the forwarder the packed dimensions, gross weight, crate count, origin and delivery address. A port delivery and a truck delivery to the billboard site cover different legs of the journey. Request a dated freight quote with the named delivery point and trade terms.
Identify who pays for insurance, import clearance, duties, last-mile delivery and unloading. If the truck stops at a warehouse, include the second trip to site. If delivery includes unloading at the site, mark that item as covered before adding the crane contractor’s price.
Steel structure and foundation cost
A replacement display on a serviceable frame and a new pole-mounted billboard can have the same face area but very different steel bills. For a replacement, provide the existing drawings and request a local assessment of the frame, anchor points and any repairs. For a new pole, request separate figures for engineering review, foundation work, fabricated steel and protective finish.
Agree whether the steelwork quote ends at the fabrication shop, after transport to site, or with the structure erected and ready for the display. This determines where to count delivery of the steel and the crew that installs it. DOIT VISION provides outdoor product drawings, steel-structure design CAD drawings, wiring diagrams and installation instructions free of charge. Price local review, fabrication, foundations and erection against the actual site.
Site power and data connections
The cabinet power supplies belong in the display equipment list. Ask the local electrical contractor to quote the route from the building or site supply to the screen, including distribution equipment, external cabling, connections and testing. Include the available supply point and cable route on the site drawing. A long underground run and a nearby connection need different allowances.
Costo de instalación y puesta en marcha
Ask the installer to quote crew time, lifts or scaffolding, site access and working hours. Confirm whether the price includes removing an old face, lifting cabinets onto the finished frame, aligning them and connecting power and signal. For a roof or a busy street, give the installer the permitted access times before asking for a figure.
Define the handover test. For example, the installer and operator can agree to check each cabinet, play a sample advert, verify brightness control and hand over the controller settings. Record who covers commissioning, training and a return visit if power or the steelwork is delayed.
Add up the installed project budget
Start with the agreed equipment quote for Square 960 or Square 1000. Add freight, steel and foundations, site electrical work, installation and commissioning. Use the same currency and tax basis throughout. If one contractor bundles two items, enter the combined amount once and mark the second line as covered.
| Budget package | Base de cotización | Responsible party and handover to confirm |
|---|---|---|
| Equipo de visualización | Selected configuration, quantities and agreed supply scope. | Supplier and recipient; identify included controls, accessories and spares. |
| Structure and site preparation | Survey, design and construction scope for the actual site. | Design/review, fabrication and installation parties; agreed ready-for-mounting condition. |
| Energía y datos | Required connections, available supply and external cable routes. | Site contractor and display installer; power-entry and data interfaces, testing responsibilities. |
| Transporte y entrega | Packing details, route, shipment timing and agreed delivery terms. | Seller/buyer, logistics provider and recipient; destination and unloading boundary. |
| Manejo e instalación | Access, equipment, crew and working window. | Named installation and lifting parties; receive, position and secure the display. |
| Puesta en marcha y entrega | Agreed tests, control setup, training and handover records. | Commissioning lead and accepting party; define completion and remaining actions. |
Marque cada cantidad como quoted, estimated or unpriced. If the steel contractor is still assessing the existing frame, report the confirmed subtotal with the frame cost pending. Once that quote arrives, add it to the subtotal and check whether it already includes lifting. List ongoing electricity, site rent and maintenance in the operating budget.
- Tema
- Outdoor LED billboard cost by face size and installed project budget
- Historical estimates
- The 2024 guide listed nominal faces of 20, 50 and 126 square meters, or approximately 215, 538 and 1,356 square feet. Current equipment and site costs require dated quotations.
- Alcance del presupuesto
- Define the completion point, then identify structure, power and data, transport, handling, installation, commissioning and handover packages.
- Responsabilidades
- Record the quotation basis, budget payer, executing party and handover point for each package. Count overlapping inclusions only once.
- Cantidades
- Separate quoted amounts, estimates with a stated basis and unpriced items; unpriced does not mean zero cost. Keep operating costs separate.
- Producto primario
- Standard Square 960 or Square 1000 cabinets, sized to the agreed active face.
- Soporte de ingeniería
- DOIT VISION provides outdoor product drawings, steel-structure design CAD drawings, wiring diagrams and installation instructions free of charge.
- Accesorios
- Identify the controller, cabling, spares and mounting accessories on the equipment quotation.
- Trabajos en el sitio
- Structure fabrication, foundations, local engineering review and installation are separately defined scope items.
- El próximo paso
- Share a short project requirement to match a Square configuration and clarify equipment, site and delivery quotation scope.
How much did a 4 × 5 m outdoor billboard cost in the 2024 guide?
Can an existing billboard structure be reused?
Which electrical costs sit outside the display package?
Does delivery to site include unloading and lifting the screen into position?
What drawings and installation materials can DOIT VISION provide?
How should I budget before every contractor has quoted?
Analice sus requisitos de brillo.
Cuéntenos qué funciones necesita la pantalla. Podemos sugerirle una configuración cuadrada y confirmar los detalles de brillo y potencia para su presupuesto.
Solicitar cotización